SYS · 01SIA 271POS. 01← Alle Systeme

Flat roof waterproofing

Polymer-bitumen membranes and single-ply synthetic membranes with protection layer, drainage and finish. Executed per SIA 271 on tapered insulation 1.5–2.0 %.

01 · Systemdaten
Norm
SIA 271
System-Code
POS. 01
Substrate
Tapered insulation on concrete slab
System
Polymer-bitumen membrane, 2-ply
Detail-Sheet
DET. 02–01 / 12
02 · Layer build-up

The construction, layer by layer.

  1. POS. 00Substrate / concrete slabSTB. 180
  2. POS. 01Primer coat0.2 mm
  3. POS. 02Vapour barrier3 mm
  4. POS. 03Thermal insulation160 mm
  5. POS. 04Polymer-bitumen membrane2 × 4 mm
  6. POS. 05Protection layerWATER6 mm
  7. POS. 06Drainage layer40 mm
  8. POS. 07Finish— mm